{"product_id":"anchor-bolts-dowels-chemical-anchors-method-statement","title":"Anchor Bolts, Dowels \u0026 Chemical Anchors Method Statement – Editable Word Template","description":"\u003cp\u003eA professional, fully editable method statement for installing cast-in anchor bolts, dowels, post-installed mechanical anchors and bonded chemical anchors.\u003c\/p\u003e\n\u003cp\u003eDesigned for contractors, civil engineers, structural engineers, specialist installers and QA\/QC teams to control anchoring works from design release and setting out through scanning, drilling, installation, curing, testing and final handover.\u003c\/p\u003e\n\u003cp\u003eWHAT’S INCLUDED\u003c\/p\u003e\n\u003cp\u003e• 38-page editable Microsoft Word document  \u003cbr\u003e• Document reference: CV-LIB-MS-CIV-042  \u003cbr\u003e• Revision: Rev 0  \u003cbr\u003e• 25 controlled technical sections  \u003cbr\u003e• Eight controlled release gates  \u003cbr\u003e• 11 practical appendices and working records  \u003cbr\u003e• Project and installation particulars  \u003cbr\u003e• Roles, responsibilities and release authorities  \u003cbr\u003e• Competence, briefing and communication requirements  \u003cbr\u003e• Materials, equipment and installation resources  \u003cbr\u003e• Design, anchor-schedule and product approvals  \u003cbr\u003e• Pre-installation planning and technical submissions  \u003cbr\u003e• Substrate type, strength, thickness and condition checks  \u003cbr\u003e• Reinforcement, tendon and embedded-service verification  \u003cbr\u003e• Anchor location, spacing and edge-distance controls  \u003cbr\u003e• Setting out and tolerance verification  \u003cbr\u003e• Reinforcement and service scanning requirements  \u003cbr\u003e• Controlled drilling methods and drilling-depth limits  \u003cbr\u003e• Hole diameter, depth and alignment controls  \u003cbr\u003e• Hole cleaning, brushing, blowing and vacuuming  \u003cbr\u003e• Cast-in anchor-bolt and dowel installation  \u003cbr\u003e• Post-installed mechanical-anchor installation  \u003cbr\u003e• Chemical-anchor product and batch controls  \u003cbr\u003e• Cartridge storage, shelf-life and temperature limits  \u003cbr\u003e• Chemical-anchor drilling and injection readiness  \u003cbr\u003e• Initial resin discharge and correct mixing controls  \u003cbr\u003e• Adhesive injection and void-prevention requirements  \u003cbr\u003e• Threaded-rod and reinforcing-bar insertion  \u003cbr\u003e• Installation depth, alignment and rotation controls  \u003cbr\u003e• Adhesive curing and environmental monitoring  \u003cbr\u003e• Protection against movement and premature loading  \u003cbr\u003e• Torque tightening and calibrated-tool requirements  \u003cbr\u003e• Installation tolerances and as-built verification  \u003cbr\u003e• Proof testing, test loads and acceptance controls  \u003cbr\u003e• Associated grouting and final load release  \u003cbr\u003e• Failed tests, defects and nonconformity management  \u003cbr\u003e• Approved remedial work and reinspection  \u003cbr\u003e• HSE, chemical-exposure and environmental controls  \u003cbr\u003e• Inspection records, handover and change control  \u003cbr\u003e• Instant digital delivery  \u003cbr\u003e• Five-download access limit  \u003c\/p\u003e\n\u003cp\u003eIMPORTANT\u003c\/p\u003e\n\u003cp\u003eThis is a professional standard template, not a structural design, product approval or project-approved method statement. It must be reviewed, completed and adapted for the substrate, design loads, anchor type, anchor schedule, reinforcement and service locations, drilling method, hole condition, approved product system, installation temperature, curing time, tightening torque, proof-test requirements, applicable legislation, standards and client requirements before use.\u003c\/p\u003e\n\u003cp\u003eNo anchor should be installed, tested or loaded when the approved design, substrate, product, location, hole condition or environmental limitations differ from the released basis.\u003c\/p\u003e\n\u003cp\u003eThe completed project document must be reviewed and approved by appropriately competent and authorised engineering, construction, specialist-installation, QA\/QC and HSE personnel.\u003c\/p\u003e\n\u003cp\u003eLICENCE\u003c\/p\u003e\n\u003cp\u003eLicensed to the purchasing organisation for editing and use on its own projects. Resale, redistribution, sublicensing or sharing of the original template is prohibited.\u003c\/p\u003e","brand":"Constravio","offers":[{"title":"Default Title","offer_id":53134959771968,"sku":"CV-LIB-MS-CIV-042","price":9.99,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0997\/4428\/4992\/files\/AnchorBolts-Dowels_ChemicalAnchors-MS.png?v=1789011274","url":"https:\/\/documents.constravio.com\/products\/anchor-bolts-dowels-chemical-anchors-method-statement","provider":"Constravio","version":"1.0","type":"link"}