Blinding & Lean Concrete Inspection and Test Plan – Editable Word Template
DOCUMENT NUMBER: CV-LIB-ITP-CIV-019
REVISION: 0
DOCUMENT TYPE: Editable Microsoft Word Template
LENGTH: 29 pages
INSPECTION AND TEST ACTIVITIES: 52
The CONSTRAVIO Blinding & Lean Concrete Inspection and Test Plan, document number CV-LIB-ITP-CIV-019, Revision 0, provides a structured quality-control framework for inspecting, testing and releasing blinding and lean-concrete works.
The editable ITP contains 52 inspection and test activities with acceptance criteria, reference documents, inspection frequencies, responsibilities, Hold, Witness, Review and Surveillance points, and required quality records.
INSPECTION STAGES COVERED
• Formation, excavation and geotechnical release
• Dewatering and surface preparation
• Setting-out and level verification
• Pile, service, sump and waterproofing interfaces
• Concrete mixture approval
• Delivery access and plant readiness
• Delivery-ticket and batch verification
• Concrete placement and spreading
• Thickness and dimensional checks
• Screeding and surface-finish inspection
• Fresh-concrete testing where specified
• Curing and protection
• Final levels and as-built survey
• Defect repair and reinspection
• Area release and follow-on work readiness
• Handover and final acceptance
INCLUDED FORMS AND RECORDS
• Inspection request and notification
• Blinding work-front release particulars
• Work-front technical checklist
• Lean-concrete delivery and batch register
• Daily placement, finish and curing record
• Formation, batch, area and test traceability register
• Blinding level, thickness and as-built register
• Fresh-concrete and dimensional test report
• Pile, service, sump and waterproofing-interface release
• Set-out, pre-placement and method-validation record
• NCR, repair, reinspection and concession register
• Hold and witness-point register
• Handover dossier records index
• Final acceptance and area-release summary
IMPORTANT
The ITP must be reviewed and tailored to the approved drawings, specifications, geotechnical release criteria, concrete mixture, required thickness, dimensional tolerances, finish, curing period, testing frequency and project authority matrix.
The template does not establish project-specific acceptance values. These must be taken from the approved project documents and concrete-mixture requirements.
LICENCE
Licensed for use by the purchasing organisation on its own projects. Resale, redistribution, sublicensing or representation as an original third-party product is prohibited.