Excavation & Earthworks Method Statement – Editable Word Template

Excavation & Earthworks Method Statement – Editable Word Template

£11.99
Skip to product information
Excavation & Earthworks Method Statement – Editable Word Template

Excavation & Earthworks Method Statement – Editable Word Template

£11.99

A professional, fully editable method statement for excavation and earthworks.

Designed for contractors, subcontractors, project managers, construction managers, site engineers, QA/QC teams and HSE professionals to plan and control open excavations, trenches, backfilling and reinstatement.

WHAT’S INCLUDED

• 32-page editable Microsoft Word document
• Document reference: CV-LIB-MS-CIV-001
• Revision: Rev 0 – Initial standard issue
• Survey, setting-out and work-zone controls
• Utility locating, scanning and trial-hole verification
• Excavation in soil or rock
• Sloping, benching, shoring and shielding controls
• Safe access, edge protection and plant segregation
• Dewatering and environmental monitoring
• Formation inspection and release controls
• Selected fill, backfilling, compaction and testing
• Reinstatement, records and handover requirements
• 9 practical appendices and control records
• Instant digital delivery
• Five-download access limit

IMPORTANT

This is a professional standard template, not a project-approved method statement. It must be reviewed, completed and adapted for the specific project, excavation design, ground conditions, utility information, permit requirements, applicable legislation, standards, client requirements and site conditions before use.

The completed project document must be reviewed and approved by appropriately competent and authorised personnel.

LICENCE

Licensed to the purchasing organisation for editing and use on its own projects. Resale, redistribution, sublicensing or sharing of the original template is prohibited.

You may also like